OEM

Home  >  OEM

Dependable Products

The company mainly focuses on the research, production and service of high-quality diesel and gas units. The power of the units produced by the company ranges from 3KW to 3000KW, covering various purposes, including silent type, container type, mobile power station type, automatic type, multi grid connected type, remote centralized monitoring, etc.

Cummins, Perkins, Volvo and Doosan are mainly used. Weichai, Shangchai and other domestic and foreign famous brands' engines are used as the driving force, and the world first-class technology of Stanford, Marathon, Engel, Lelysima and other famous brands' generators are selected to ensure excellent quality.

Shunfeng has established a good reputation in the generator industry and customers with convincing quality and service, and its products are exported to more than 100 countries and regions abroad.

Generator process flow

1

Winding:

Use special equipment to wind the enameled wire to form a coil.

2

Binding:

Preliminary binding of insulation materials for coils.

3

Forming:

Pull the coil into a frame type coil. The frame type coil takes the inner and outer circles of the motor stator and iron core as the standard to form a centripetal angle grounding coil.

4

Shaping:

Reshape the insulating material to avoid inconvenience when inserting wires.

5

Binding:

Wrap the insulating materials again as required.

6

Hot Pressing:

Hot pressing the packed materials.

7

Withstand Voltage Test:

Inspect and correct the quality of previous processes.

8

Embedded Wire:

Several external leads after withstand voltage.

9

Paint Dipping:

Several lead wires shall be introduced after withstand voltage; cure the insulation of the bar and the conductor inside and outside the slot to prevent vibration from damaging the insulation structure.

10

Drying:

Drying the dipping process

Process Flow Of Generator Set

The public base of the unit goes online
The power is connected to the public base
The power is connected to the motor
The motor is tightened with the power connection bolt
The public base is tightened with the power and the motor connection bolt
The radiator and its components are installed
The electronic control of the unit is installed Some components
Add water and oil
Test run
Print the test run report, sign and file it
Install the unit cover (silent and protective shed)
Secondary test run
Drain oil and water
Sort out the unit
Paste decals
Install the unit nameplate
Equip with the unit accessories
Online finished product inspection
Packaging
Offline and warehousing

OEM Certificate

Shangchai Certificate of Authorization

Shanghai kaipu Certificate of Authorization

Shanghai Qianneng Certificate of Authorization

Shanghai Qianneng Certificate of Authorization-2

Quantum CEO & our partners

WuXi FARADAY Certificate of Authorization

Yuchai Certificate of Authorization

Yuchai marine generator set Certificate of Authorization

Copyright © 2023.Shunfeng Generating Equipment Co., Ltd. All rights reserved.

Privacy Policy